- Infrared surveys
- Water & air infiltration testing
- Moisture vapor transmission testing
- Materials & corrosion testing
- Coating testing
- Concrete testing
FEATURED PROJECTS
Harrisonburg Fire Station #1
SKA completed a hygro-thermal analysis of two typical wall systems and one typical soffit regarding Fire Station #1 in Harrisonburg, Virginia. The goal of the analyses was to determine the moisture vapor drive in the modeled exterior enclosure systems for determining...
NC State University Page Hall
SKA was requested to perform an analysis of the three proposed wall systems for Page Hall at North Carolina State University using hygrothermal software, WUFI, to evaluate the performance of the wall system and determine if condensation may be an issue. WUFI is an...
Lake Tabor Dam
Lake Tabor is a reservoir located near Tabor City, in Columbus County, NC. Lake Tabor is retained primarily by an earth and concrete dam on the south end of the Lake. The dam includes steel sheet piles and a concrete dam and spillway structure. Portions of the steel...
Lake Townsend Dam
SKA performed an engineering assessment to determine the root cause(s) of cracking of the hardened concrete and to provide an opinion on the general condition and future anticipated service life of the dam. Our assessment found that the strength and integrity of the...
Mitchell Water Treatment Plant
Mitchell Water Treatment Plant has the ability to produce about 24 million gallons of water per day. The filter house, sedimentation basins and mixing chambers were mainly constructed in the 1950’s with additions in the early 1960’s. The primary structural system in...
The Towers at Harbor Court
Constructed in 1987, The Towers at Harbor Court was Baltimore's first luxury high-rise condominium properties adjacent to Inner Harbor, providing striking views of the Baltimore Skyline. With 174 luxury residences, this amenity-rich multifamily structure stands at an...
Nissan Stadium
SKA was contracted to assess the condition of the Nissan Stadium and develop repair documents for the waterproofing of the upper deck and upper concourse. Engineers identified water infiltration issues stemming from incorrect original installation of expansion joints...
Sandpiper Run Condominiums Buildings A and B
This project consisted of window and door, stucco facade and structural concrete renovations at two beach front condominiums in Pawleys Island, South Carolina. Over 588 windows and doors along the balconies and courtyards were replaced and over 40,000 sf of stucco...
Waterlake Dam
Working with the City of Hamlet, SKA performed an engineering assessment of the hardened concrete of this 1920 vintage dam structure to visually identify distress conditions within the hardened concrete structure, provide an opinion on the general condition of the...