SKA provided structural and MEP design services for the expansion of GKN’s Mebane Plant. The project scope for this 24,000 sf warehouse addition included a pre-engineered metal building located at the front of the original manufacturing facility. As part of the design...
As part of the 2016 ConnectNC Bond Referendum, University of North Carolina at Greensboro was provided $105 million to complete the design and construction of a new Nursing Instructional Building and South Chiller Plant on the Greensboro Campus. While the two...
SKA has provided all of the structural engineering design services for the Greensboro Coliseum for the past 50 years. The projects have ranged widely in type and size from minor maintenance improvements to major renovations such as the 1993 expansion and the recent...
Noted as the first Level 1 Pediatric Trauma Center in the state, the only pediatric emergency department in the region, and the first emergency department constructed under a parking deck in North Carolina, this $8 million new construction project completed in 2010....
SKA provided multi-disciplinary services including a structural peer review, design, building envelope commissioning and quality assurance testing during construction. As the structural engineer of record on this four-story, 70,600 sf addition, our design incorporated...