After the Phase 1 work was completed by WxProofing, SKA performed a roof assessment and infrared survey of all Phase 2 roof areas. This also included the small Emergency Entrance Roof that was not originally included in SKA’s initial Phase 1 assessment. Based on information provided, SKA’s updated roof assessment in May 2023, the infrared survey of 2018, and experience with similar projects, we proposed the following scope of services for the Phase 2 roof replacement/repair of multiple roof areas and the Emergency Entrance Roof. With the assistance of a third-party contractor, SKA performed 10 test cut excavations and assist with observations. Skylights on two roofs were removed and capped with stainless steel in preparation for reroofing.