Greensboro Aquatic Center Lighting Upgrades
  1. Home
  2. Projects
  3. Aquatics
  4. Greensboro Aquatic Center Lighting Upgrades

SKA was contacted to provide engineering services for replacement of the existing HID lighting fixtures serving the Greensboro Aquatics Center (GAC) main Competition Pool, Dive Well and Rec. Pool to LED lighting fixtures. The new LED lighting fixtures specified in the design documents shall utilize the existing light truss wiring system that is currently installed.  The overall illuminance in the areas noted above shall be increased from the existing illuminance to a level more similar to the Training Pool constructed in 2019. The scope of work included a preliminary study and investigation to determine existing conditions, correspondence with existing lighting fixture manufacturer and preliminary material cost analysis, the design and development of contract drawings for the new lighting design, preparation of electrical construction drawings including coordination with the existing lighting fixture manufacturer for the latest LED product information and calculations and developed Autocad drawings with specifications for demolition of the existing HID light fixtures and for installation of the new LED light fixtures.