The new facility is 120,000 sf and mostly one level, however, there will be a small office area on the second level that is 9,000 sf. The structural system will consist of exterior concrete tilt-up wall construction. The remainder of the structure will consist of structural steel framing, steel joists, and metal decking. The structural grid will accommodate 50-foot bays in the garage areas.