SKA joined with a contractor to provide structural engineering for the NCSU Doak Baseball Stadium renovations and additions. As part of the renovation and enhancement project, a new 12,400 sf Batting and Pitching Lab is being added along with a new state of the art player lounge, locker room and player development center. Directly above the new player lounge and locker area, the right field concourse will be expanded for additional gathering and concessions spaces. The left field concourse is also being expanded with additional restroom and concessions areas, a new fan entrance and terraced seating along the outfield line. The total project budget is approximately $19 Million dollars and will be split into three separate construction phases to accommodate the baseball operations, including the design and construction of temporary batting and pitching facilities while the main additions are under construction.