SKA has provided full-service engineering services to TE Connectivity/AMP, one of the largest manufactures of electrical and electronic connectors, for over 30 years. Our services included prime designer for additions and upfits as well as being design consultants on major plant expansion projects throughout the US and Mexico. As an example, SKA performed design and construction administration services for a major addition to a local plant. The addition was composed of a 32,771 sf manufacturing area addition as well as a 35,549 sf warehouse area addition. SKA was the prime designer and performed design services for the general, structural, mechanical, plumbing and fire protection disciplines. Lab renovations and relocations have been essential projects for TE Connectivity along with mechanical and electrical upgrades. Providing full-service design services, SKA served as the prime designer for a 4,000 sf renovation of the medical molding clean room area. SKA included provisions to control the impact of construction work on the adjacent manufacturing areas including: dust walls, negative air pressurization, and off hours construction for highly disruptive activities. Another relocation project involved complete design and construction administration services for the relocation of a 16,000 sf strategic tooling operations center. The project included new HVAC, lights, plumbing, walls, fire protection, etc. The project scope included new offices and a controlled environment room for micro-machining operations. A sampling of projects include: 719 Pegg Road Plating Line Replacements, Hermosillo AUT L30 Plating Upfit, RR Bldg 067 Design Engineering Upfit, Reidsville Road RTU Replacement, Reidsville Road AHU 1 & 2 Replacement Study, and 3800 Reidsville Rd Shower Addition.