Passionate about the design of new facilities and complex renovations, SKA understands the need for building systems to provide a comfortable and healthy environment for users in a balanced internal environment. With all mechanical, electrical, and plumbing (MEP) and fire protection (FP) design services under one service line, clients receive the smartest, highest quality solution, while maintaining design integrity, system performance goals, and costs. Our goal is to provide MEP and FP systems that meet our client’s expectations in terms of function, cost, efficiency and environmental impact.
- HVAC design
- Chiller replacement design
- Equipment assessments
- Commissioning
- Power distribution system design
- Emergency power system design
- Lightning protection design
- Arc Flash studies
FEATURED PROJECTS
NC State University Belltower Restoration
This project completed an installation of a 55 bell carillon in conjunction with the repair, restoration and preservation of NC States iconic Memorial Belltower. Improvements addressed tower accessibility and use restrictions to permit installation of the clavier in...
GTCC Aviation Center
SKA is providing Structural and MEP engineering design services for the creation of a new 100,000 sf facility at the Cameron Campus to relocate the Aviation program currently located in the AVII and Ceasar Cone II Buildings. The first phase consists of 70,000 sf and...
Thomas Built Buses Plant Renovations
SKA has worked continuously for Thomas Built Buses in High Point, North Carolina, since 2007, with 114 projects over 13 years. Being an established company, TBB’s need for engineering design services has been focused on maintenance and upgrades to existing facilities....
Hotel Roanoke Pub Renovation
The Hotel Roanoke was built in 1882 by the Norfolk and Western Railroad in Roanoke, Virginia. It’s original 34 rooms grew to 384 rooms by 1989 when it was donated to the Virginia Polytechnic Institute and State University. In 1995, a major renovation added a...
Grandfather Mountain New Top Shop
Severe wind, cold, snow and ice and the multi-story building profile required the use of the latest construction techniques to meet the harsh weather conditions for this landmark facility situated at the peak of historic Grandfather Mountain. The extreme wind...
PTIA Renovations
SKA teamed with a local architect on PTIA south concourse renovation which included MEP upgrades. The scope of the project included terminal ceiling renovations which involved removing existing ductwork, adding in fabric ductwork, redoing the fire protection system...