SKA worked with a local architect to provide mechanical, plumbing and electrical design services for renovations and improvements to the 12,169 sf Siler City Town Hall. Siler City Town Hall is housed in the towns original courthouse building which is on the historic...
Originally a 1929 silent movie theatre, the Stevens Center is a magnificently restored neoclassical theatre located in downtown Winston-Salem. Re-opened in April of 1983, it is the primary performance space for several local and state arts organizations. In 2000,...
SKA is providing Structural and MEP engineering design services for the creation of a new 100,000 sf facility at the Cameron Campus to relocate the Aviation program currently located in the AVII and Ceasar Cone II Buildings. The first phase consists of 70,000 sf and...
SKA is the prime designer and providing electrical engineering services for the Cone Art Lighting Upgrades project. The Art Museum’s 2015 Facility Condition Assessment Program (FCAP) report noted that the lighting infrastructure, including the dimming controls and...
SKA is part of the Design Build team that handled the design and construction of two new 20,000 sf corporate hangars installed at Smith Reynolds Airport in Winston-Salem, NC. For the hangars, SKA provided structural engineering services related to the design of the...