by scott@forcefieldnc.com | May 28, 2015
SKA provided structural engineering design for this two-story, 46,150 sf field house; retaining wall and storage building required for relocation of fields 8 and 9; a 70 foot pre-engineered prefabricated steel pedestrian bridge added to cross over a wetland to tie two...