Originally a 1929 silent movie theatre, the Stevens Center is a magnificently restored neoclassical theatre located in downtown Winston-Salem. Re-opened in April of 1983, it is the primary performance space for several local and state arts organizations. In 2000,...
SKA was retained by the NC Dept. of Public Safety to design repairs and a roof recover system for their 1000 bed adult correctional facility. The Alexander Correctional Institution complex consists of approximately 20 roof areas comprising 287,000+ sf of roof area....
The new facility is 120,000 sf and mostly one level, however, there will be a small office area on the second level that is 9,000 sf. The structural system will consist of exterior concrete tilt-up wall construction. The remainder of the structure will consist of...
Mitchell Water Treatment Plant has the ability to produce about 24 million gallons of water per day. The filter house, sedimentation basins and mixing chambers were mainly constructed in the 1950’s with additions in the early 1960’s. The primary structural system in...
SKA completed a visual condition assessment of the exterior facade of Hendersonville City Hall in 2020. The purpose of the assessment was to determine the overall condition of the facade, to document issues that may have contributed to ongoing leakage into the...