SKA was the prime designer and Engineer of Record for the new Novant Health Heart and Vascular Institute-Cancer Institute (HVI-CI) parking deck in Midtown Charlotte. The new eight-story parking deck consists of approximately 1,004 spaces and 391,000 sf, and consists...
SKA performed condition assessments and subsequent repairs on the Sherrill Center and Ridges Parking Decks at UNCA. During the assessments, structural and maintenance deficiencies were identified and reported. SKA prepared a report of the findings including a...
SKA provided structural engineering services for the HPU Parking Deck completed before classes began in Fall 2023. This is the first parking deck on High Point University’s campus. This deck is a 5-level, 1,100 car parking deck constructed utilizing precast concrete....
SKA provided structural design for new six-level, 660 space, precast concrete parking deck to serve the new county courthouse to be constructed simultaneously nearby. The design reflects the scale and character of the surrounding office buildings and maintains the...
Novant Health engaged SKA’s services to provide condition assessments of eight parking decks. The project scope involved review of available construction documents, maintenance reports, and repair documents provided by Novant Health. SKA conducted visual assessments...