Working with a design build team, SKA served as structural engineer for SKA will provide vertical gravity and lateral supports for the new helipad and elevated walkway. The helipad and walkway horizontal framing were designed by FEC and design loads were provided to SKA. To support the elevated walkway near the new elevator tower, a new cast-in-place concrete beam was provided between existing precast concrete columns. SKA provided both horizontal and vertical gravity and lateral framing for the new crew quarters structure. SKA also provided the gravity and lateral framing for the new elevator tower. which is a standalone structure with an expansion joint between the new tower and the existing deck structure. SKA provided supports for the new pedestrian bridge. The new elevator tower provided support to one end of the pedestrian bridge.