Greensboro Aquatic Center Training Pool
  1. Home
  2. Projects
  3. Aquatics
  4. Greensboro Aquatic Center Training Pool

This 21,750 sf addition to the original aquatic center resulting in a fourth pool that acts as the training pool for the GAC. This pool provides 8 50-meter lanes and 11 25-yard lanes for training purposes. SKA is also the prime designer, structural, electrical and fire protection engineer for the fourth pool addition which completed in September 2019. The 78,000 sf facility includes a 50-meter competitive pool, 10-meter platform diving well, warm-up/teaching pool and seating for 1800 spectators. The facility has locker rooms, family changing rooms and separate entrance from the main entrance of the GAC. Two new courtyards were created as a part of this project to allow for outdoor gathering areas during large events.