SKA has a long-standing relationship with the UNC Greensboro campus, designing 250 projects in the past 50 years. As part of a larger renovation project, SKA was selected to perform special inspections, renovations, design review, and construction administration on...
SKA provided prime design, bidding, and construction administration services for a new pedestrian bridge connection at the fifth level over an alley between two adjacent parking decks. One parking deck is owned by the City of Greensboro and the other is owned by...
SKA was the structural engineer of record, having performed structural engineering design and construction contract administration services for the new state of art FTCC Aviation Center, at Smith Reynolds Airport in Winston-Salem. The new FTCC Aviation Center is...
SKA teamed with a local architect on PTIA south concourse renovation which included MEP upgrades. The scope of the project included terminal ceiling renovations which involved removing existing ductwork, adding in fabric ductwork, redoing the fire protection system...
The Asheville High School restoration/repair project consisted of repairs and renovations to six separate buildings on the campus. One project involved the original building constructed in 1928, consisting of removing the original clay tile roof, adding new...