by scott@forcefieldnc.com | May 28, 2025
SKA worked with a local architect to provide mechanical, plumbing and electrical design services for renovations and improvements to the 12,169 sf Siler City Town Hall. Siler City Town Hall is housed in the towns original courthouse building which is on the historic...
by JRMancuso@skaeng.com | May 27, 2025
SKA was the structural engineer of record for design of the abutments for the new single lane pre-engineered bridge that spans over the Swannanoa River and connects Gashes Creek Road and Azalea Road East to the abutment walls. SKA furnished design and construction...
by JRMancuso@skaeng.com | May 27, 2025
Originally a 1929 silent movie theatre, the Stevens Center is a magnificently restored neoclassical theatre located in downtown Winston-Salem. Re-opened in April of 1983, it is the primary performance space for several local and state arts organizations. In 2000,...
by JRMancuso@skaeng.com | May 27, 2025
SKA is providing Structural and MEP engineering design services for the creation of a new 100,000 sf facility at the Cameron Campus to relocate the Aviation program currently located in the AVII and Ceasar Cone II Buildings. The first phase consists of 70,000 sf and...
by JRMancuso@skaeng.com | May 27, 2025
SKA is the prime designer and providing electrical engineering services for the Cone Art Lighting Upgrades project. The Art Museum’s 2015 Facility Condition Assessment Program (FCAP) report noted that the lighting infrastructure, including the dimming controls and...